The field "foreseen date of the next Marketing Authorisation application submission for this RPI" does NOT cover variations for an existing Marketing authorisation, but only new MAAs, for example a new MAA for an orphan condition when the same RPI already is linked to a "standard" (non-orphan) authorisation product, or when a generic version is developed for an existing "standard" authorisation product. If no new MAA are foreseen for the RPI in the future, then 31/12/2099 should be specified (not 21/12/2099).
The fields "foreseen legal basis of next MAA" and "foreseen eligibility basis of next MAA" should include the option to select "N/A" for these situations, this is a known bug and it is scheduled to be fixed soon; until then, please select the existing legal basis and eligibility basis.